SERVICES PROVIDED
Here’s How We Did It
Gilliland Construction Management was retained to oversee the final design and manage the construction of the new Weld School and Training Facility at the Miramar Construction and Operations Center. The project includes the demolition of the existing 1,820 building and the fabrication, construction and installation of a new 5,621 s.f. state of the art, pre-engineered steel welding test facility and a new 2,283 s.f. masonry instructional building with restrooms, breakroom, support spaces and covered canopies for cutting equipment. Site work includes grading, gas utilities, domestic water utilities, fire sprinkler site utilities, stormwater, site walls, resurfacing and restriping of the onsite asphalt and new ADA parking.
GCM Project Profile – Weld School and Training Center