Gilliland CM is currently in design with a client for an entire operations center to have a new Microgrid power system. The new Microgrid power system will generate power from the new LG solar panels and store the power in the GO Electric Microgrid platform via lithium batteries. In the event the solar panels are not able to generate power and the batteries are depleted, a standby generator can be brought online automatically through the GO Electric control systems. Gilliland CM’s client is joining the push to be more environmentally responsible.

Thank you to our team members: Cadiz & Cadiz Architects, H+W Engineering, Inc.

Alternative Text

By Kirt Gilliland

Sep 02, 2021