Gilliland CM recently completed two exterior canopies over an existing parking and loading area for a large San Diego company. Gilliland CM was retained to manage the design, bidding, permitting, and construction for the project. The larger of the two canopies spans 95’ with a cantilevered roof requiring large steel posts and 15’ deep footings. The canopies include overhead electrical charging stations and racking for storage. Thank you to all our partners Prava Construction Services, Inc. , Cadiz & Cadiz Architects, aark engineering inc. for making it possible to pull off this exciting project.

Alternative Text

By Kirt Gilliland

Apr 08, 2021