This past weekend the mat slab was poured for the new six story high-rise being built at 450 B St. The pour took over nine hours with a crew of 20 men and included approximately 80 trucks 750 yd.³ of concrete that’s approximately 3,000,000 pounds of concrete and 100,000 pounds of rebar.
Developer: LeBeau Realty Associates
General Contractor: CW Driver
Architect: Gensler
Structural engineer: Coffman Engineers